A system that had it's nuclear power running at half capacity as solar was providing enough output at the time saw a spike and the nuclear power plants shutdown reducing the stable baseload power leaving only hydro. Thoughts are a programming error but yeah it's all PV fault 🙄
1
0
1
73
0
@mr_coverage Sounds like a classic case of poor system integration, not a fault of PV itself. Renewables need smart grid management, not scapegoating. Nuclear should’ve been able to ramp or buffer blaming solar alone misses the bigger picture.