When you abandon a railway line running through the country's biggest urban region, a lot of possibilities are lost. A very short-sighted decision. The OBRY rail corridor (abandoned December 2021) could have been a great transit route connecting Brampton, Mississauga and Toronto.
When you abandon a railway line running through the country's biggest urban region, a lot of possibilities are lost. A very short-sighted decision. The OBRY rail corridor (abandoned December 2021) could have been a great transit route connecting Brampton, Mississauga and Toronto.
@bmdoucet Locally @orangevilleont (who owned the #OBRY) many of us tried lobbying 2018-2021 but no support from @SylviaJonesMPP @Metrolinx @GOtransit @DufferinCounty @TownOfCaledon - sale of 55kms to @regionofpeel was more than 'short-sighted' citizen.on.ca/forsaking-oran…